Engineering survey · Geospatial · Digital engineering
Precision survey for Australia's major infrastructure.
Construction set-out, as-built conformance and 3D geospatial delivery for tier-one contractors on rail, road, tunnel and water programs.
Recent programs
- CPB — North East Link
- John Holland — Inland Rail B2A
- LCRP · Metro Tunnel · West Gate Tunnel
01 / Services
What we deliver on site
Survey crews, instruments and data processing resourced to major-project programs.
Construction set-out & control
Primary and secondary control networks, structure and alignment set-out to design tolerance.
As-built & conformance survey
Conformance reporting and as-built records packaged to client ITP and handover requirements.
Rail corridor & track survey
Track geometry, clearance and possession survey across live and occupied corridors.
3D laser scanning
Registered point clouds for existing-conditions capture, clash detection and volumes.
UAV survey & photogrammetry
Aerial capture for progress survey, earthworks volumes and site-wide orthophotography.
Monitoring & deformation
Automated and periodic monitoring of structures, retention systems and adjacent assets.
Current-generation kit
The latest software and equipment
We invest in instruments and software ahead of the program, so survey is never the constraint on a critical path.
How we work
Built to exceed client expectations
The same crews, supervisors and project history our clients have worked with for years — now resourced under one group.
02 / Projects
Current programs
John Holland · 2025 — Current
Inland Rail — Beveridge to Albury, Tranche 2
$470M design & construct
Major upgrades to the North East Rail Line across eight sites between Wandong and Benalla, Victoria, forming part of the 262 km Beveridge-to-Albury section. Road bridge replacements, track lowering, station and platform upgrades and pedestrian underpasses to provide the clearances required for double-stacked freight.
CPB Contractors · 2025 — Current
North East Link
$1.23 billion
The Eastern Freeway upgrade from Tram Road to Springvale Road is a major $1.23 billion project delivered by the Synergy consortium (CPB Contractors, BMD Constructions, and Arup) as part of the North East Link Project Target Completion: Slated for completion around 2028, timed to open alongside the main North East Link tunnels and M80 Ring Road completion.
03 / Contact
Send us a scope
Tell us the program, the package and the dates. We will come back with crew availability and a rate submission.
- Phone
- 0404 940 164
